Custom Builder

Build a Custom Implement

Know what you need? Open the builder and choose the instrument first. Use Find My Alignment only when the instrument family is not clear.

Know the Instrument

Build Direct

Start with instrument selection and move through material, options, engraving, and review.

Need Direction

Find My Alignment

Use the guide first when the instrument, discipline style, or instrument family is not clear yet.

Full Paddle from $65 View Finished ExamplesShop Foundation ReleasesHow It Works
01 Instrument
Choose instrument
Choose the instrument that defines the build path, overall scale, and compatible options that follow through the rest of the record.
Choose the instrument that establishes scale, silhouette, striking behavior, and the option groups available throughout the record.

Need a build outside these options? Use Custom Piece Inquiry.

02 Material
Choose wood
Assign the wood species that will determine character, visual tone, weight, material risk, and pricing tier for the piece.
Select the species that will define tone, figure, weight, material risk, and applicable pricing for the commission.

Foundation

Base-price species for clean entry builds. Pine and Poplar are the standard Foundation woods.

Standard

Core species selected for reliable performance, balanced presentation, and standard material handling.

Signature

Elevated species with stronger figure, more distinct character, or a moderate material upcharge relative to Standard stock.

Reserve

Highest-risk or limited species with the greatest material sensitivity, strongest upcharge, or reduced bench availability.

03Handle Record
Optional
Define the grip treatment, wrap direction, and any handle-side decisions that affect control, finish, and presentation.

Leather Wrap

Choose the handle treatment for this build.

04Body Record
Optional
Declare the body structure, face treatment, drilling pattern, edge direction, and any physical refinements tied to the striking surface.

Studs

Choose a stud color for the striking surface.

05Finish Register
Optional
Standard satin oil is included. Choose the active finish profile for the build record; additional finish-oil profiles appear here when released.

Finish Profile

Standard satin oil is included. Scented finish-oil profiles appear here when released.

06Engraving Directive
Optional
Record the engraving directive, placement requirements, proof path, and any adjustment notes that must follow the build packet.

Engraving Record

Declare the face treatment

Choose an instrument first to establish engraving availability, pricing, and safe placement.

Material GuidanceChoose a wood species to receive engraving contrast and detail guidance.
Not Selected
Engraving availability depends on the selected instrument. Work outside the standard path requires a custom inquiry.
07Review Build Record
Review & submit
Review the record in full, accept Build Terms and Consent & Safety, then add the paid commission to cart.

Build Record Summary

Build Total Select Instrument + Wood
Commission Timing 2-4 weeks for completion

The production window begins after Build Review and production release. For custom images, logos, symbols, or other artwork, production work and the 2-4 week completion window do not begin until the final artwork proof is approved. Shipping standard.

The Full Build Price is collected at checkout through the assigned instrument and add-on products. Payment secures the Build Record, material allocation, and Build Review. Shipping transit is separate from the 2-4 week production window.

Complete the required build selections before adding the commission to cart. If a selection is temporarily unavailable, choose another available option or use Custom Piece Inquiry.

How This Commission Path Works

Commission Path

The builder establishes the Build Total, paid commission record, Build Review, Production Release, production, and archive path.

01

Build Record

Select the instrument, material, handle, body, finish, and engraving direction.

02

Build Review

Scope, compatibility, material availability, proof requirements, and bench release are reviewed after checkout.

03

Production Window

Standard completion is 2-4 weeks after Build Review and production release.

04

Artwork Approval + Shipping

For custom images or artwork, production work and the 2-4 week completion window begin only after final proof approval. Shipping transit follows completion.

SSB Standard

Bench Status

Submissions remain open only when bench capacity can support new paid commissions entering the commission queue.

Paid Commission Standard

Full payment is required to submit the commission and secure the build record, material allocation, and bench placement.

Record First

The build record captures the selected instrument, wood, handle, body, finish, engraving, total, and payment status.